[ROOT] dt FactFinance < WHERE DimAccountId EQ '60' > SHUFFLE < SKIP 174 > < TAKE 250 >
250 items
FactFinanceId | Amount | Date | DimAccountId | DimDepartmentGroupId | DimOrganizationId | Scenario |
---|---|---|---|---|---|---|
36667 | 13895.70 | 2025-02-13 | 60 | 2 | 11 | Actual |
31138 | 28481.08 | 2024-09-14 | 60 | 1 | 12 | Actual |
10285 | 50900.00 | 2023-02-13 | 60 | 1 | 4 | Budget |
29746 | 45861.03 | 2024-08-14 | 60 | 2 | 8 | Actual |
568 | 22698.00 | 2022-05-15 | 60 | 3 | 6 | Actual |
23331 | 9829.67 | 2024-02-13 | 60 | 2 | 11 | Actual |
31494 | 88274.00 | 2024-10-14 | 60 | 1 | 4 | Actual |
9308 | 31000.00 | 2023-01-13 | 60 | 1 | 5 | Budget |
25537 | 2080.59 | 2024-04-14 | 60 | 1 | 12 | Actual |
24305 | 17494.70 | 2024-03-14 | 60 | 1 | 11 | Actual |
36229 | 27096.00 | 2025-02-13 | 60 | 1 | 6 | Actual |
38879 | 60776.46 | 2025-04-15 | 60 | 6 | 8 | Actual |
6659 | 16000.00 | 2022-10-15 | 60 | 6 | 8 | Budget |
3370 | 20900.00 | 2022-08-15 | 60 | 1 | 3 | Budget |
7303 | 28300.00 | 2022-11-15 | 60 | 3 | 6 | Budget |
2493 | 24240.00 | 2022-07-16 | 60 | 6 | 4 | Actual |
14124 | 32980.48 | 2023-05-15 | 60 | 2 | 8 | Actual |
37286 | 58995.00 | 2025-03-15 | 60 | 1 | 5 | Actual |
24834 | 41576.00 | 2024-04-14 | 60 | 1 | 5 | Actual |
18261 | 17494.70 | 2023-09-15 | 60 | 1 | 11 | Actual |
5104 | 14040.00 | 2022-09-15 | 60 | 4 | 6 | Actual |
36547 | 44327.66 | 2025-02-13 | 60 | 2 | 8 | Actual |
13940 | 21022.00 | 2023-05-15 | 60 | 6 | 6 | Actual |
5344 | 23520.00 | 2022-09-15 | 60 | 6 | 7 | Actual |
16341 | 13488.24 | 2023-07-16 | 60 | 6 | 11 | Actual |
31285 | 31635.17 | 2024-09-14 | 60 | 2 | 13 | Actual |
38939 | 34697.15 | 2025-04-15 | 60 | 1 | 11 | Actual |
5289 | 34000.00 | 2022-09-15 | 60 | 1 | 7 | Budget |
6274 | 9700.00 | 2022-10-15 | 60 | 5 | 6 | Budget |
22920 | 4822.00 | 2024-02-13 | 60 | 2 | 6 | Actual |
6601 | 17900.00 | 2022-10-15 | 60 | 2 | 8 | Budget |
28684 | 35383.33 | 2024-07-15 | 60 | 1 | 11 | Actual |
24982 | 29009.00 | 2024-04-14 | 60 | 3 | 6 | Actual |
6329 | 14820.00 | 2022-10-15 | 60 | 6 | 6 | Actual |
10341 | 34400.00 | 2023-02-13 | 60 | 6 | 4 | Budget |
10156 | 17700.00 | 2023-02-13 | 60 | 6 | 3 | Budget |
33715 | 18113.00 | 2024-12-15 | 60 | 7 | 3 | Actual |
16849 | 7761.00 | 2023-08-15 | 60 | 2 | 6 | Actual |
28913 | 4894.47 | 2024-07-15 | 60 | 2 | 12 | Actual |
38967 | 15727.65 | 2025-04-15 | 60 | 2 | 11 | Actual |
4877 | 28800.00 | 2022-09-15 | 60 | 6 | 5 | Budget |
4547 | 13020.00 | 2022-09-15 | 60 | 6 | 3 | Actual |
12402 | 17227.00 | 2023-04-15 | 60 | 6 | 3 | Actual |
1693 | 23000.00 | 2022-06-15 | 60 | 3 | 6 | Budget |
19206 | 47115.60 | 2023-10-15 | 60 | 6 | 8 | Actual |
13391 | 34151.72 | 2023-04-15 | 60 | 6 | 8 | Actual |
31374 | 75141.00 | 2024-10-14 | 60 | 1 | 3 | Actual |
3509 | 6480.00 | 2022-08-15 | 60 | 7 | 3 | Actual |
24214 | 46209.52 | 2024-03-14 | 60 | 2 | 8 | Actual |
37319 | 55973.00 | 2025-03-15 | 60 | 6 | 5 | Actual |
15897 | 15371.00 | 2023-07-16 | 60 | 5 | 6 | Actual |
2065 | 47515.60 | 2022-06-15 | 60 | 1 | 8 | Actual |
13613 | 46488.00 | 2023-05-15 | 60 | 1 | 4 | Actual |
22708 | 53563.00 | 2024-02-13 | 60 | 1 | 4 | Actual |
18142 | 86439.06 | 2023-09-15 | 60 | 1 | 8 | Actual |
35571 | 17940.46 | 2025-01-13 | 60 | 4 | 11 | Actual |
17232 | 14314.86 | 2023-08-15 | 60 | 1 | 11 | Actual |
25217 | 96677.12 | 2024-04-14 | 60 | 1 | 8 | Actual |
5755 | 8080.00 | 2022-10-15 | 60 | 7 | 3 | Actual |
22974 | 15973.00 | 2024-02-13 | 60 | 4 | 6 | Actual |
1596 | 19800.00 | 2022-06-15 | 60 | 1 | 6 | Budget |
7350 | 15600.00 | 2022-11-15 | 60 | 4 | 6 | Budget |
29778 | 51227.79 | 2024-08-14 | 60 | 6 | 8 | Actual |
30040 | 5188.09 | 2024-08-14 | 60 | 2 | 12 | Actual |
10342 | 28980.00 | 2023-02-13 | 60 | 6 | 4 | Actual |
26463 | 13275.47 | 2024-05-14 | 60 | 3 | 11 | Actual |
15248 | 2991.24 | 2023-06-15 | 60 | 2 | 11 | Actual |
35629 | 24313.98 | 2025-01-13 | 60 | 6 | 11 | Actual |
30159 | 30989.55 | 2024-08-14 | 60 | 2 | 13 | Actual |
5943 | 29760.00 | 2022-10-15 | 60 | 1 | 5 | Actual |
26346 | 58350.65 | 2024-05-14 | 60 | 6 | 8 | Actual |
22833 | 39961.00 | 2024-02-13 | 60 | 6 | 5 | Actual |
30992 | 7940.27 | 2024-09-14 | 60 | 2 | 11 | Actual |
20234 | 53820.27 | 2023-11-15 | 60 | 6 | 8 | Actual |
31680 | 27273.00 | 2024-10-14 | 60 | 1 | 6 | Actual |
190 | 40900.00 | 2022-05-15 | 60 | 1 | 4 | Budget |
36076 | 59202.00 | 2025-02-13 | 60 | 6 | 4 | Actual |
3557 | 46640.00 | 2022-08-15 | 60 | 1 | 4 | Actual |
18289 | 3054.01 | 2023-09-15 | 60 | 2 | 11 | Actual |
21764 | 31717.00 | 2024-01-13 | 60 | 6 | 4 | Actual |
34986 | 66447.00 | 2025-01-13 | 60 | 1 | 5 | Actual |
2440 | 40900.00 | 2022-07-16 | 60 | 1 | 4 | Budget |
22265 | 35879.02 | 2024-01-13 | 60 | 6 | 8 | Actual |
3932 | 20176.00 | 2022-08-15 | 60 | 3 | 6 | Actual |
35835 | 30989.55 | 2025-01-13 | 60 | 2 | 13 | Actual |
3699 | 29000.00 | 2022-08-15 | 60 | 1 | 5 | Budget |
26315 | 67864.47 | 2024-05-14 | 60 | 2 | 8 | Actual |
14096 | 87254.22 | 2023-05-15 | 60 | 1 | 8 | Actual |
23592 | 95680.00 | 2024-03-14 | 60 | 1 | 3 | Actual |
10659 | 28500.00 | 2023-02-13 | 60 | 3 | 6 | Budget |
30401 | 56810.00 | 2024-09-14 | 60 | 6 | 4 | Actual |
8519 | 11830.00 | 2022-12-16 | 60 | 5 | 6 | Actual |
21856 | 35880.00 | 2024-01-13 | 60 | 6 | 5 | Actual |
17172 | 48021.67 | 2023-08-15 | 60 | 6 | 8 | Actual |
28766 | 18512.81 | 2024-07-15 | 60 | 4 | 11 | Actual |
23925 | 4671.00 | 2024-03-14 | 60 | 2 | 6 | Actual |
31735 | 28620.00 | 2024-10-14 | 60 | 3 | 6 | Actual |
25836 | 48510.00 | 2024-05-14 | 60 | 6 | 4 | Actual |
38529 | 24298.00 | 2025-04-15 | 60 | 1 | 6 | Actual |
36367 | 21429.00 | 2025-02-13 | 60 | 6 | 6 | Actual |
36284 | 29204.00 | 2025-02-13 | 60 | 3 | 6 | Actual |
30904 | 60218.87 | 2024-09-14 | 60 | 6 | 8 | Actual |
10562 | 23800.00 | 2023-02-13 | 60 | 1 | 6 | Budget |
20915 | 20796.00 | 2023-12-16 | 60 | 1 | 6 | Actual |
13645 | 39647.00 | 2023-05-15 | 60 | 6 | 4 | Actual |
17052 | 43534.00 | 2023-08-15 | 60 | 6 | 7 | Actual |
662 | 9984.00 | 2022-05-15 | 60 | 5 | 6 | Actual |
38584 | 25502.00 | 2025-04-15 | 60 | 3 | 6 | Actual |
13740 | 33009.00 | 2023-05-15 | 60 | 6 | 5 | Actual |
36459 | 60398.00 | 2025-02-13 | 60 | 6 | 7 | Actual |
19053 | 63806.00 | 2023-10-15 | 60 | 1 | 7 | Actual |
27761 | 4943.40 | 2024-06-14 | 60 | 2 | 12 | Actual |
37788 | 30841.76 | 2025-03-15 | 60 | 1 | 11 | Actual |
3286 | 25939.44 | 2022-07-16 | 60 | 6 | 8 | Actual |
7452 | 18100.00 | 2022-11-15 | 60 | 6 | 6 | Budget |
6742 | 24700.00 | 2022-11-15 | 60 | 1 | 3 | Actual |
26852 | 51750.00 | 2024-06-14 | 60 | 6 | 3 | Actual |
24186 | 88069.39 | 2024-03-14 | 60 | 1 | 8 | Actual |
11462 | 34400.00 | 2023-03-15 | 60 | 6 | 4 | Budget |
39287 | 36719.48 | 2025-04-15 | 60 | 2 | 13 | Actual |
13203 | 32800.00 | 2023-04-15 | 60 | 6 | 7 | Budget |
472 | 19800.00 | 2022-05-15 | 60 | 1 | 6 | Budget |
20763 | 36149.00 | 2023-12-16 | 60 | 6 | 4 | Actual |
11273 | 17700.00 | 2023-03-15 | 60 | 6 | 3 | Budget |
2494 | 22700.00 | 2022-07-16 | 60 | 6 | 4 | Budget |
16669 | 35682.00 | 2023-08-15 | 60 | 6 | 4 | Actual |
34124 | 78200.00 | 2024-12-15 | 60 | 1 | 7 | Actual |
11932 | 20600.00 | 2023-03-15 | 60 | 6 | 6 | Budget |
10946 | 32800.00 | 2023-02-13 | 60 | 6 | 7 | Budget |
13585 | 22963.00 | 2023-05-15 | 60 | 7 | 3 | Actual |
16228 | 3277.42 | 2023-07-16 | 60 | 2 | 11 | Actual |
26131 | 15195.00 | 2024-05-14 | 60 | 6 | 6 | Actual |
3698 | 28000.00 | 2022-08-15 | 60 | 1 | 5 | Actual |
26729 | 57177.76 | 2024-05-14 | 60 | 2 | 13 | Actual |
12483 | 9752.00 | 2023-04-15 | 60 | 7 | 3 | Actual |
16255 | 9543.49 | 2023-07-16 | 60 | 3 | 11 | Actual |
21377 | 13232.92 | 2023-12-16 | 60 | 3 | 11 | Actual |
3980 | 16000.00 | 2022-08-15 | 60 | 4 | 6 | Budget |
17460 | 1183.76 | 2023-08-15 | 60 | 2 | 12 | Actual |
21523 | 2316.76 | 2023-12-16 | 60 | 1 | 12 | Actual |
2392 | 5000.00 | 2022-07-16 | 60 | 7 | 3 | Budget |
30609 | 25768.00 | 2024-09-14 | 60 | 3 | 6 | Actual |
11602 | 29300.00 | 2023-03-15 | 60 | 6 | 5 | Budget |
18402 | 13869.10 | 2023-09-15 | 60 | 6 | 11 | Actual |
15987 | 76783.00 | 2023-07-16 | 60 | 1 | 7 | Actual |
7253 | 11336.00 | 2022-11-15 | 60 | 2 | 6 | Actual |
30692 | 17728.00 | 2024-09-14 | 60 | 6 | 6 | Actual |
23243 | 49380.79 | 2024-02-13 | 60 | 6 | 8 | Actual |
10237 | 7200.00 | 2023-02-13 | 60 | 7 | 3 | Budget |
27587 | 23360.77 | 2024-06-14 | 60 | 3 | 11 | Actual |
23443 | 20993.70 | 2024-02-13 | 60 | 6 | 11 | Actual |
12730 | 29300.00 | 2023-04-15 | 60 | 6 | 5 | Budget |
2 | 20200.00 | 2022-05-15 | 60 | 1 | 3 | Budget |
29566 | 21642.00 | 2024-08-14 | 60 | 6 | 6 | Actual |
8574 | 18018.00 | 2022-12-16 | 60 | 6 | 6 | Actual |
6554 | 51818.71 | 2022-10-15 | 60 | 1 | 8 | Actual |
1926 | 39240.00 | 2022-06-15 | 60 | 1 | 7 | Actual |
18170 | 38054.82 | 2023-09-15 | 60 | 2 | 8 | Actual |
37165 | 15698.00 | 2025-03-15 | 60 | 7 | 3 | Actual |
34276 | 44745.85 | 2024-12-15 | 60 | 6 | 8 | Actual |
28564 | 98274.12 | 2024-07-15 | 60 | 1 | 8 | Actual |
4960 | 18600.00 | 2022-09-15 | 60 | 1 | 6 | Budget |
11135 | 27878.87 | 2023-02-13 | 60 | 6 | 8 | Actual |
18672 | 59315.00 | 2023-10-15 | 60 | 1 | 4 | Actual |
11030 | 42800.00 | 2023-02-13 | 60 | 1 | 8 | Budget |
27440 | 55758.18 | 2024-06-14 | 60 | 2 | 8 | Actual |
1843 | 16692.00 | 2022-06-15 | 60 | 6 | 6 | Actual |
12672 | 40500.00 | 2023-04-15 | 60 | 1 | 5 | Budget |
16929 | 11930.00 | 2023-08-15 | 60 | 5 | 6 | Actual |
1132 | 20200.00 | 2022-06-15 | 60 | 1 | 3 | Budget |
32531 | 45299.00 | 2024-11-14 | 60 | 6 | 3 | Actual |
3184 | 29400.00 | 2022-07-16 | 60 | 1 | 8 | Budget |
35598 | 4084.88 | 2025-01-13 | 60 | 5 | 11 | Actual |
24333 | 6108.32 | 2024-03-14 | 60 | 2 | 11 | Actual |
27532 | 33666.28 | 2024-06-14 | 60 | 1 | 11 | Actual |
19825 | 38033.00 | 2023-11-15 | 60 | 6 | 5 | Actual |
22741 | 37781.00 | 2024-02-13 | 60 | 6 | 4 | Actual |
21463 | 13232.92 | 2023-12-16 | 60 | 6 | 11 | Actual |
3835 | 22464.00 | 2022-08-15 | 60 | 1 | 6 | Actual |
33268 | 16032.97 | 2024-11-14 | 60 | 3 | 11 | Actual |
25898 | 57641.00 | 2024-05-14 | 60 | 1 | 5 | Actual |
14246 | 2959.32 | 2023-05-15 | 60 | 2 | 11 | Actual |
31019 | 22902.25 | 2024-09-14 | 60 | 3 | 11 | Actual |
7067 | 31000.00 | 2022-11-15 | 60 | 1 | 5 | Budget |
18201 | 54364.22 | 2023-09-15 | 60 | 6 | 8 | Actual |
29838 | 35383.33 | 2024-08-14 | 60 | 1 | 11 | Actual |
12203 | 16000.00 | 2023-03-15 | 60 | 2 | 8 | Budget |
11134 | 19100.00 | 2023-02-13 | 60 | 6 | 8 | Budget |
17314 | 13106.32 | 2023-08-15 | 60 | 4 | 11 | Actual |
28712 | 10879.69 | 2024-07-15 | 60 | 2 | 11 | Actual |
4677 | 50880.00 | 2022-09-15 | 60 | 1 | 4 | Actual |
21824 | 53775.00 | 2024-01-13 | 60 | 1 | 5 | Actual |
28274 | 24706.00 | 2024-07-15 | 60 | 1 | 6 | Actual |
1982 | 28280.00 | 2022-06-15 | 60 | 6 | 7 | Actual |
19174 | 59800.68 | 2023-10-15 | 60 | 2 | 8 | Actual |
14597 | 12318.00 | 2023-06-15 | 60 | 7 | 3 | Actual |
11077 | 26484.91 | 2023-02-13 | 60 | 2 | 8 | Actual |
19613 | 61175.00 | 2023-11-15 | 60 | 6 | 3 | Actual |
6880 | 6000.00 | 2022-11-15 | 60 | 7 | 3 | Actual |
16080 | 82361.71 | 2023-07-16 | 60 | 1 | 8 | Actual |
14218 | 20229.86 | 2023-05-15 | 60 | 1 | 11 | Actual |
6879 | 5300.00 | 2022-11-15 | 60 | 7 | 3 | Budget |
26020 | 5912.00 | 2024-05-14 | 60 | 2 | 6 | Actual |
992 | 15600.00 | 2022-05-15 | 60 | 2 | 8 | Budget |
16140 | 54906.65 | 2023-07-16 | 60 | 6 | 8 | Actual |
12590 | 34400.00 | 2023-04-15 | 60 | 6 | 4 | Budget |
28121 | 52992.00 | 2024-07-15 | 60 | 6 | 4 | Actual |
1787 | 9700.00 | 2022-06-15 | 60 | 5 | 6 | Budget |
9445 | 24800.00 | 2023-01-13 | 60 | 1 | 6 | Budget |
38343 | 81282.00 | 2025-04-15 | 60 | 1 | 4 | Actual |
22438 | 20229.86 | 2024-01-13 | 60 | 6 | 11 | Actual |
6984 | 28280.00 | 2022-11-15 | 60 | 6 | 4 | Actual |
32439 | 33572.05 | 2024-10-14 | 60 | 6 | 13 | Actual |
34865 | 19665.00 | 2025-01-13 | 60 | 7 | 3 | Actual |
24360 | 9639.24 | 2024-03-14 | 60 | 3 | 11 | Actual |
28181 | 50053.00 | 2024-07-15 | 60 | 1 | 5 | Actual |
30872 | 40563.96 | 2024-09-14 | 60 | 2 | 8 | Actual |
9773 | 39100.00 | 2023-01-13 | 60 | 1 | 7 | Budget |
2713 | 19292.00 | 2022-07-16 | 60 | 1 | 6 | Actual |
7205 | 24800.00 | 2022-11-15 | 60 | 1 | 6 | Budget |
29368 | 49514.00 | 2024-08-14 | 60 | 6 | 5 | Actual |
23090 | 62192.00 | 2024-02-13 | 60 | 1 | 7 | Actual |
12261 | 30109.22 | 2023-03-15 | 60 | 6 | 8 | Actual |
24774 | 33584.00 | 2024-04-14 | 60 | 6 | 4 | Actual |
3043 | 36600.00 | 2022-07-16 | 60 | 1 | 7 | Budget |
29625 | 71162.00 | 2024-08-14 | 60 | 1 | 7 | Actual |
4736 | 27400.00 | 2022-09-15 | 60 | 6 | 4 | Budget |
33001 | 81328.00 | 2024-11-14 | 60 | 1 | 7 | Actual |
520 | 6600.00 | 2022-05-15 | 60 | 2 | 6 | Budget |
26911 | 16905.00 | 2024-06-14 | 60 | 7 | 3 | Actual |
9636 | 7644.00 | 2023-01-13 | 60 | 5 | 6 | Actual |
5475 | 30000.13 | 2022-09-15 | 60 | 2 | 8 | Actual |
27614 | 18894.73 | 2024-06-14 | 60 | 4 | 11 | Actual |
8657 | 34880.00 | 2022-12-16 | 60 | 1 | 7 | Actual |
6275 | 9568.00 | 2022-10-15 | 60 | 5 | 6 | Actual |
14837 | 9142.00 | 2023-06-15 | 60 | 2 | 6 | Actual |
15100 | 91693.70 | 2023-06-15 | 60 | 1 | 8 | Actual |
35276 | 79488.00 | 2025-01-13 | 60 | 1 | 7 | Actual |
802 | 37080.00 | 2022-05-15 | 60 | 1 | 7 | Actual |
10610 | 9508.00 | 2023-02-13 | 60 | 2 | 6 | Actual |
8048 | 49440.00 | 2022-12-16 | 60 | 1 | 4 | Actual |
28355 | 18241.00 | 2024-07-15 | 60 | 4 | 6 | Actual |
22023 | 10850.00 | 2024-01-13 | 60 | 5 | 6 | Actual |
7778 | 16546.84 | 2022-11-15 | 60 | 6 | 8 | Actual |
28061 | 18975.00 | 2024-07-15 | 60 | 7 | 3 | Actual |
15040 | 64584.00 | 2023-06-15 | 60 | 6 | 7 | Actual |
4876 | 28000.00 | 2022-09-15 | 60 | 6 | 5 | Actual |
2858 | 17200.00 | 2022-07-16 | 60 | 4 | 6 | Budget |
31997 | 47324.69 | 2024-10-14 | 60 | 2 | 8 | Actual |
21554 | 3404.01 | 2023-12-16 | 60 | 6 | 12 | Actual |
Generated 2025-06-14 13:25:05.047 UTC